Kentucky Site Work Contractor Since 1981
Clearing, demolition, mass excavation, storm & sanitary sewer, water main and site concrete — one call for commercial, government, industrial and residential projects across Hardin County and beyond.
45 Yrs
Moving Kentucky dirt since 1981
$120M+
In completed site contracts
14+ mi
Of new Kentucky highway built
20 mi
Of water main on a single project
What We Do
From the first tree cleared to the last curb poured, our crews, fleet and in-house surveyors handle every phase of site development — big highway jobs or a single basement dig.
Site and building demo, clearing, off-site hauling.
GPS grade control from 2,500-acre sites to residential basements.
New builds, rehab, underground detention, sewer separation.
Gravity sewer, force main and lift stations.
Quality pipe, fittings and valves — a complete site package.
Private developments and commercial stormwater basins.
Slipform sidewalk, curb & gutter, pavement and retaining walls.
Bidding now
Request a free quote →
10 min
from Fort Knox, Elizabethtown & Radcliff
Why Phillips Brothers
Phillips Brothers started on a Hardin County dairy farm in 1981. Since then we've built 14+ miles of new highway for the Kentucky Transportation Cabinet, delivered nine Fort Knox military projects — including the largest GC project in the post's history — and handled site work for hospitals, distilleries and manufacturers across the region.
Clearing to curbs — earthwork, utilities and concrete under one contract.
Owned equipment and in-house mechanics keep jobs on schedule.
Computerized cost accounting, estimating and 3D site modeling.
OSHA, MSHA, confined space, CPR & flagger certified.
Proven on Kentucky's Biggest Sites
Fort Knox, KY · Military
Largest GC project in Fort Knox history — 100 acres, $10M site development, finished ahead of schedule
Owensboro, KY · Healthcare
154 acres · $12M mass excavation, utilities & paving
Owensboro, KY · Municipal
$4.6M urban stormwater reroute — box culverts & detention
Meade & Hardin Co. · KYTC
9.6 miles of new limited-access highway across three phases
Hardin County · Roadway
$12.4M · 4.7 miles of new road, storm & sanitary reconstruction
Safety
Weekly safety meetings plus annual confined-space, MSHA, machine-awareness, CPR, bloodborne-pathogen and certified-flagger training for our crews.
Now Hiring
Laborers · Equipment Operators · Pipe Layers · CDL Truck Drivers. Steady, year-round local work on some of Kentucky's biggest sites.
Apply TodayFree, no-obligation estimates
Send us your plans or tell us about your site. Our estimators respond fast — usually within one business day.